INEOS, Grangemouth, GBRThe INEOS Grangemouth site is a major petrochemical complex and is the largest manufacturing site in Scotland refining about 40% of the UK's petrol and supplying ethylene, ethanol and plastics. Ondeo Industrial Solutions are key INEOS partner for environmental services having secured a 20 year contract to manage the site's water and wastewater infrastructure. In total Ondeo IS has 30 staff on site managing full operations and maintenance of 2 demineralisation plants, 7 cooling systems, 3 wastewater plants and all associated equipment and infrastructure. Ondeo Industrial Solutions through its unique turnkey approach to identify, design, construct, fund and operate value creating projects have saved INEOS over 6 MGBP per annum and created benefits in production availability and reliability. These projects have included sludge management and disposal, recycling effluent for use in cooling water systems, infrastructure management and repairs, and installation of boiler control systems minimising unnecessary blowdown and waste. Ondeo Industrial Solutions also manages asset development of the utilities infrastructure and have delivered significant projects such as installation of 40 MW of cooling capacity for the Catalytic Cracker (FCCU) facility, pipe relining of old cooling water infrastructure and have completed a full (I)PPC survey and recommendations for submission to the Scottish Environmental Protection Agency (SEPA). Ondeo Industrial Solutions brings operational and engineering expertise with a strong health and safety culture with accreditations to ISO 9001:2000 (Quality), ISO 14001 (Environment), OHSAS 18001 (Health and Safety) and Investors in People. Ondeo IS identifies and solves issues as well as delivering and funding value creating projects allowing INEOS to concentrate on its core business of oil refining and petrochemical production. |
| © Ondeo Industrial Solutions 2006 - Legal statements |

